Design control
An independent verification process for the design of systems, structures, and components classified as safety-related.
Document control
Version management, review, and approval of technical documentation before distribution and use.
Design change control
A procedure to assess and approve design modifications, with documented technical justification.
What an auditor usually asks for
- Design verification procedure documented
- Document control system in place
- Log of design changes and their justification
- Current technical documentation accessible to staff
How to cover this block in Kimobox
- 1Manage technical documentation with version control in Kimobox.
- 2Log design verification as an independent approval workflow.
- 3Document every design change with its technical justification.
Technical documentation stays version-controlled, with review and approval always traceable.
Where each figure comes from
References to the official text in force. If a standard is revised, this page is updated and the review date says so.
- UNE standards catalogue UNE, Spanish Association for Standardisation · Official catalogue
- Consejo de Seguridad Nuclear CSN · Regulatory body
- IAEA GSR Part 2 — Leadership and Management for Safety International Atomic Energy Agency · 2016 ed.