Risk and FMEA
Risk analysis translates into design and process FMEA, directly linked to the control plan.
Contingency planning
Contingency plans to secure supply against disruption: equipment failure, external supply failure or disasters.
Quality objectives
Quality and performance objectives aligned with customer requirements, tracked by plant and by line.
What an auditor usually asks for
- A process FMEA linked to the control plan
- A documented and tested contingency plan
- Quality objectives per plant and per line with tracking
- A risk register updated after every process change
How to cover planning in Kimobox
- 1Link the process FMEA to its control plan directly in the system.
- 2Document the contingency plan as just another record, with its periodic test.
- 3Define quality objectives per plant and let the system track them.
The FMEA and the control plan stay linked: changing one flags the other for review.
Where each figure comes from
References to the official text in force. If a standard is revised, this page is updated and the review date says so.
- IATF 16949:2016 — Quality management system requirements for automotive production IATF · October 2016
- IATF 16949 Sanctioned Interpretations and FAQs IATF Global Oversight · Continuously updated
- AIAG-VDA FMEA Handbook AIAG and VDA · First edition, 2019