Our own servers in Europe · GDPR · Support in your language

Templates and records · IATF 16949 · Clause 8.3.5.2

Process FMEA (PFMEA) template for IATF 16949

The analysis that anticipates how each process step could fail, what the effect would be and which control prevents or detects it. The control plan flows from it.

In one sentence

The process FMEA analyses, step by step along the flow chart, the possible failure modes, their effects and causes, the prevention and detection controls and the priority for action, because IATF 16949 requires it among the outputs of manufacturing process design (8.3.5.2) and as the basis for the control plan; the method is set by the customer, and today it is almost always that of the 2019 AIAG-VDA handbook.

Content reviewed on

Where the standard requires it
IATF 16949 · Clause 8.3.5.2 Clauses are those of IATF 16949:2016, which always applies together with ISO 9001:2015. The AIAG and VDA manuals cited are industry references that apply when the customer requires them; they are not part of the standard.
Type of information
Mandatory document Mandatory output of process design (8.3.5.2); a living document that is maintained
Who fills it in
Multidisciplinary team Process engineering, production, quality and maintenance; the facilitator knows the method
When
During process design Before PPAP, and reviewed after changes, complaints, nonconformities and field failures
How long it is kept
Part life + 1 year For part approvals, tooling records, product and process design records, purchase orders and contracts: for as long as the part is active in production and service, plus one calendar year, unless the customer or a regulatory agency specifies otherwise (7.5.3.2.1).

What the standard requires


What IATF 16949 demands and what it leaves to your judgement

IATF lists the process FMEA among the outputs of manufacturing process design, alongside the flow chart and the control plan, and requires the risk analysis to be reviewed in light of lessons learned, complaints and field failures (6.1.2.1). In problem solving it requires the FMEA to be updated when the cause reveals an unanalysed risk (10.2.3).

The standard does not prescribe a method. The AIAG-VDA handbook, published in 2019, organises the analysis into seven steps —planning, structure, function, failure, risk, optimisation and documentation— and replaces the risk priority number with a high, medium or low action priority that gives more weight to severity.

What customers usually require in their CSRs is the specific method and how special characteristics are marked.

Structure


Fields the template should include

  • Scope: part, process, plant and analysis team
  • Process step according to the flow chart and work element (machine, person, material, environment)
  • Function of the step and product or process characteristic
  • Failure mode, effect in the plant and at the customer, and cause
  • Severity, occurrence and detection using the method’s tables
  • Current prevention and detection controls
  • Action priority and special characteristics
  • Optimisation actions, owner, deadline and re-rating
  • Review and link to the control plan

Example


Example: one row of the FMEA for a nut welding operation

Company, people and figures are fictitious: the example only shows what a properly completed record looks like.

Field Content
Step OP 40 · projection welding of an M8 nut onto a seat bracket (fictitious part)
Function Join the nut with a minimum push-out torque of 40 N·m
Failure mode Nut welded with insufficient push-out torque
Effect At the customer, the seat bolt comes loose during assembly · severity 8
Cause Electrode worn beyond the replacement interval · occurrence 5
Current controls Prevention: electrode change every 3,000 welds · Detection: torque test on 1 part per shift · detection 6
Action priority High
Action Automatic counter that locks the machine when the weld limit is reached, plus current monitoring on every cycle · process engineering · 30 April
Re-rating Severity 8 · occurrence 2 · detection 3 · low priority
Control plan 100% current monitoring with a reaction plan is added

At the audit


Mistakes auditors commonly flag

  • An FMEA produced once for PPAP and never reviewed after complaints or changes.
  • FMEA steps that do not match the flow chart or the control plan.
  • Occurrence or detection ratings lowered without any real control in place.
  • Actions on high-priority risks that have been open for months.
  • A “family” FMEA that does not capture the specifics of the line being audited.

In Kimobox


How this record is kept in Kimobox

  1. 1The process FMEA is linked to its control plan within the system itself.
  2. 2Changing one prompts a review of the other.
  3. 3Optimisation actions have an owner and a date, with an alert if they slip.
  4. 4Process nonconformities and complaints are linked to the FMEA that needs reviewing.

Frequently asked questions


What people ask us before getting started

Do I have to use the AIAG-VDA FMEA?

If the customer requires it in its CSRs, yes, and most manufacturers do. If not, the organisation may keep another method, provided it analyses failure modes, effects, causes and controls and prioritises actions.

What is action priority?

The high, medium or low rating that replaces the risk priority number in the AIAG-VDA handbook. It comes from combining severity, occurrence and detection in a table that gives more weight to severity, so that a serious risk is not masked by good detection.

How does it relate to the control plan?

The control plan contains the controls the FMEA assumes are in place and those it adds. If the FMEA relies on a control that is not in the plan, or vice versa, the chain breaks, and the auditor spots it by comparing the two documents.

Keep your IATF 16949 records without loose templates

We'll show you the module running with data similar to yours.

Request a demo

Sources


Where each figure comes from

References to the official text in force. If a standard is revised, this page is updated and the review date says so.

  1. IATF 16949:2016 — Quality management system requirements for automotive production and relevant service parts organizations IATF · First edition, October 2016
  2. AIAG & VDA FMEA Handbook (industry reference, not part of the standard) AIAG and VDA · First edition, 2019
  3. IATF 16949 Sanctioned Interpretations and FAQs IATF Global Oversight · Continuously updated