Requirement-by-requirement evaluation
A systematic review of whether each requirement is met, with the evidence proving it at the time of evaluation.
From non-compliance to non-conformity
An unmet requirement can open a non-conformity or a corrective action within the same quality system.
Report for the management review
A summary of compliance levels by area, ready as an input for the periodic management review.
What an auditor usually asks for
- Periodic evaluation of each requirement documented
- Non-compliances turned into a non-conformity or corrective action
- Compliance report aggregated by area or site
- Evidence available for audit or inspection
How to cover periodic evaluation in Kimobox
- 1Schedule the compliance evaluation for each requirement at its set frequency.
- 2Automatically open a non-conformity when a requirement isn't met.
- 3Generate the compliance report for the management review.
An unmet requirement becomes a non-conformity with an owner and a deadline, not a note nobody looks at again.
Where each figure comes from
References to the official text in force. If a standard is revised, this page is updated and the review date says so.
- ISO 14001:2015, clause 9.1.2 (evaluation of compliance) ISO · 2015 ed.
- Boletin Oficial del Estado Spanish Official Gazette · Published daily
- ISO 37301:2021 — Compliance management systems ISO · April 2021