This block ensures activities are verified before acceptance, and that measuring equipment is reliable.

Content reviewed on

Inspection and testing

Defined inspection and test plans to verify items meet requirements before acceptance.

Measuring equipment control

Periodic calibration of measuring, inspection, and test equipment used in safety-related activities.

Inspection status

Clear identification of each item's inspection status to prevent its use before verification.

What an auditor usually asks for

  • Inspection and test plans documented
  • Measuring equipment calibration program
  • Inspection status identification for each item
  • Log of inspection and test results

How to cover this block in Kimobox

  1. 1Log inspection and test plans per item in Kimobox.
  2. 2Schedule measuring equipment calibration as periodic records.
  3. 3Document each item's inspection status on its record.

Every piece of equipment's calibration and inspection status stays visible and under control.

See audit and certificate management in Kimobox

Where each figure comes from

References to the official text in force. If a standard is revised, this page is updated and the review date says so.

  1. UNE standards catalogue UNE, Spanish Association for Standardisation · Official catalogue
  2. Consejo de Seguridad Nuclear CSN · Regulatory body
  3. IAEA GSR Part 2 — Leadership and Management for Safety International Atomic Energy Agency · 2016 ed.