Templates and records · UNE 73401
Special process qualification: welding and testing
A weld cannot be fully checked once it is made. That is why it is controlled beforehand: with qualified procedures, qualified welders and inspectors, and records for each.
In one sentence
The special process qualification record documents that the procedures for welding, heat treatment, non-destructive testing and other processes whose result cannot be fully verified afterwards are qualified, and that the people applying them hold a current qualification, because the special process control criterion of nuclear quality assurance requires it, as CSN guides GS-10.5 and GS-10.10 explain.
- Type of information
- Mandatory record Special process control criterion; GS-10.5 and, for NDT, GS-10.10
- Who fills it in
- Welding engineering and quality assurance Qualification tests are witnessed by an independent inspector where the code or the order requires it
- When
- Before the process is applied And at each renewal of personnel qualification as the code requires
- How long it is kept
- Lifetime or at least 5 years IS-24 requires licensees to keep as lifetime records, for the whole life of the facility or component, those meeting any of its criteria, and to keep non-permanent records for at least five years. Suppliers apply whatever the licensee’s purchase order specifies.
What the standard requires
What UNE 73401 demands and what it leaves to your judgement
Special processes —welding, heat treatment, non-destructive testing, among others— must be performed by qualified personnel using qualified procedures in accordance with the applicable codes, standards and requirements, and their control must be documented.
Qualification has two sides: that of the procedure, demonstrated with test coupons and tests that yield valid parameters, and that of the personnel, demonstrated through tests and maintained through practice and the renewals set by the code.
For non-destructive testing personnel, CSN guide GS-10.10, revised in 2020, deals specifically with their qualification and certification.
Structure
Fields the template should include
- Special process and applicable code or standard
- Procedure: code, revision and essential variables
- Procedure qualification record and its tests
- Qualified personnel: name, method, level or qualified positions
- Qualification date and expiry or maintenance conditions
- Continuity: evidence that the person is still applying the process
- Inspector or body that witnessed the qualification
- Work on which each procedure and person has been used
Example
Example: welding of carbon steel supports
Company, people and figures are fictitious: the example only shows what a properly completed record looks like.
| Field | Content |
|---|---|
| Process | Flux-cored arc welding · code specified in order PD-4471 (fictitious) |
| Procedure | WPS-022 revision 1 · qualified by record PQR-022 · tensile, bend and impact tests satisfactory |
| Welders | 4 welders qualified for the procedure’s positions |
| Continuity | Six-monthly record of each welder’s use of the process |
| Case | One welder had not used the process for seven months: qualification suspended pending a new test |
| NDT | Radiography by certified level II operators from the evaluated laboratory |
| Inspection | Procedure qualification witnessed by the licensee’s inspector |
At the audit
Mistakes auditors commonly flag
- Procedures applied outside the range of their essential variables.
- Welders whose qualification has lapsed for lack of continuity.
- NDT certifications of subcontracted personnel that nobody checks.
- No way of knowing which welder made each weld.
- Procedures at a different revision from the one qualified.
In Kimobox
How this record is kept in Kimobox
- 1Special process qualification is documented as a versioned record.
- 2Qualification and training of staff in critical activities are managed in their personal file, with expiry dates and alerts.
- 3Each weld or test is linked to the item, the procedure and the person who carried it out.
- 4Supplier personnel certificates are controlled through the supplier portal.
Frequently asked questions
What people ask us before getting started
What is a special process?
A process whose result cannot be fully verified by subsequent inspection or testing, so quality depends on controlling the process itself: welding, heat treatment, non-destructive testing, coatings.
What is the difference between a WPS and a PQR?
The WPS is the welding procedure specification applied in the workshop; the PQR is the record of the tests that showed the procedure produces sound joints. The first is maintained; the second is retained.
Who certifies NDT personnel?
It depends on the scheme set by the code or the order; CSN guide GS-10.10 sets out the guidelines for qualifying and certifying these personnel in nuclear facilities.
Keep your UNE 73401 records without loose templates
We'll show you the module running with data similar to yours.
Keep exploring
Related pages
Procurement and process control
Quality assurance extends to suppliers and to the processes that affect safety-related systems.
UNE 73401 quality assurance programme manual
What a nuclear quality assurance programme manual should describe under UNE 73401 and GS-10.1: scope…
UNE 73401 list of safety-related items
How to identify nuclear safety-related items and activities and their quality assurance level…
Nuclear independent design verification record
How to record independent design verification of safety items under UNE 73401 and GS-10.6: method, verifier…
Sources
Where each figure comes from
References to the official text in force. If a standard is revised, this page is updated and the review date says so.
- Guía de Seguridad GS-10.5 (Rev. 1) — Garantía de calidad de procesos, pruebas e inspecciones de instalaciones nucleares (Quality assurance of processes, tests and inspections) Consejo de Seguridad Nuclear (Spanish Nuclear Safety Council) · July 1999
- Guía de Seguridad GS-10.10 (Rev. 1) — Cualificación y certificación de personal que realiza ensayos no destructivos (Qualification and certification of non-destructive testing personnel) Consejo de Seguridad Nuclear (Spanish Nuclear Safety Council) · February 2020
- 10 CFR Part 50, Appendix B — Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants (an alternative accepted by GS-10.1) U.S. Nuclear Regulatory Commission · Current text