Our own servers in Europe · GDPR · Support in your language

Templates and records · ISO 14064 · Clause 10

GHG inventory verification findings record template

What the verifier finds when reviewing the inventory, and what the company corrects before the verification statement is issued.

In one sentence

The verification findings record logs each error, omission or lack of evidence the verifier raises, its effect on the total, the correction applied and the evidence provided; it is good practice because clause 10 of ISO 14064-1 covers the organisation’s role in verification, while ISO 14064-3:2019 governs how the verifier works.

Content reviewed on

Where the standard requires it
ISO 14064 · Clause 10 Clauses are cited using the numbering of ISO 14064-1:2018, the current edition for organisation-level inventories. Verification is governed by ISO 14064-3:2019.
Type of information
Good practice Good practice linked to clause 10 of ISO 14064-1 and to ISO 14064-3:2019
Who fills it in
Footprint lead Each correction is made by the owner of the data concerned
When
During and after each verification Before the verifier issues the statement
How long it is kept
Set by the organisation The standard requires procedures for retaining documents and records (8.2) but sets no period. Keep everything from the base year onwards, since a recalculation may mean going back to the original data.

What the standard requires


What ISO 14064 demands and what it leaves to your judgement

ISO 14064-3 sets out how the verifier plans, carries out and concludes the work: level of assurance, materiality, sampling and statement. The organisation does not audit anyone, but it must provide the information and respond to the findings.

Keeping your own findings record lets you show they were corrected, see whether they recur from one year to the next and arrive at the next verification with the weak points already resolved.

Structure


Fields the template should include

  • Verification, verifier and date
  • Finding: error, omission, lack of evidence or recommendation
  • Source or category affected
  • Estimated effect in t CO₂e and as a percentage
  • Correction or response
  • Evidence provided
  • Status and closure date
  • Action to prevent recurrence

Example


Example: verification of the 2025 inventory (fictitious company)

Company, people and figures are fictitious: the example only shows what a properly completed record looks like.

Field Content
Verification Fictitious verification body · limited assurance · 7 to 9 April 2026
Finding 1 Refrigerant top-ups at Zaragoza omitted in the second half of the year · +14 t CO₂e
Correction Maintenance contractor’s reports added · figure corrected on 10 April
Finding 2 Pamplona electricity factor for 2024 used instead of 2025 · −3 t CO₂e
Correction Factor replaced and emission factors record updated
Recommendation Ask hauliers for actual data to reduce uncertainty in category 3
Closure Verification statement issued on 22 April 2026 with no qualifications
Action Maintenance report with mandatory fields for gas type and kg recharged

At the audit


Mistakes auditors commonly flag

  • Findings are corrected in the spreadsheet without leaving a trail.
  • The same omissions turn up in verifications in different years.
  • The verifier’s recommendations are never analysed.

In Kimobox


How this record is kept in Kimobox

  1. 1The documentary evidence for each activity data item is organised for the verifier.
  2. 2The verifier’s findings and their resolution are recorded as nonconformities.
  3. 3The final emissions statement is kept as a controlled document.
  4. 4The verifier can log in with a read-only user to review the evidence.

Frequently asked questions


What people ask us before getting started

What is the level of assurance?

The degree of confidence the verifier provides: reasonable, which is more demanding, or limited, with fewer tests. It is defined in ISO 14064-3 and agreed before verification.

What is materiality in verification?

The threshold above which an error, on its own or combined with others, would change the decision of someone using the report. The verifier sets it at the planning stage and uses it to decide whether the statement can be issued.

Keep your ISO 14064 records without loose templates

We'll show you the module running with data similar to yours.

Request a demo