HACCP verification and validation plan

Checking that the plan really works and not just on paper: with which activities, how often and what was done with the results.

In one sentence

The HACCP verification plan sets out the activities that regularly check that the system is effective — review of monitoring and deviation records, equipment calibration, product testing, internal audits — and, since the 2020 Codex revision, prior validation that the controls are capable of controlling the hazards, as required by Article 5(2)(f) of Regulation (EC) 852/2004.

Content reviewed on

Where the standard requires it
HACCP · Clause 5.2 f) Clause references cite the points of Article 5(2) of Regulation (EC) 852/2004, which lists the HACCP principles; they are applied following Codex CXC 1-1969, revised in 2020.
Type of information
Mandatory record Mandatory record (Article 5(2)(f) and (g) of Regulation 852/2004)
Who fills it in
Person responsible for the HACCP plan Different, where possible, from whoever monitors day to day
When
At the frequency set in the plan And whenever anything changes that affects product safety
How long it is kept
An appropriate period Article 5(4) of Regulation (EC) 852/2004 sets no period: it requires documents and records to be kept for an appropriate length of time. Covering at least the shelf life of the product, with a margin, lets you respond to an inspection or a complaint.

What the standard requires


What HACCP demands and what it leaves to your judgement

The Regulation requires procedures, carried out regularly, to verify that the measures under the previous principles are working effectively. The 2020 Codex revision reworded principle 6: first validate the plan — show that the limits and controls work — and then verify periodically that it is being applied.

The frequency of verification is set in proportion to the risk, and the whole plan is reviewed whenever there is a change in product, process, equipment or legislation.

BRCGS develops these requirements in more detail and asks for a full review of the plan at least once a year; that sheet covers what is specific to the standard.

Structure


Fields the template should include

  • Verification activity and its frequency
  • Person responsible
  • Date carried out and result
  • Records reviewed and deviations found
  • Calibration of monitoring equipment
  • Product or environmental testing and its result
  • CCP validation and its evidence
  • Conclusion and changes to the plan

Example


Example: quarterly verification in a fictitious kitchen

Company, people and figures are fictitious: the example only shows what a properly completed record looks like.

Field Content
Period July to September 2026
Records Review of 92 days of CCP-1 and CCP-3 monitoring · 2 deviations with correct action
Calibration Probes S-01 and S-02 checked against a reference thermometer · deviation < 0.5 °C
Testing 4 microbiological tests on finished product at an external laboratory · conforming
Surfaces 6 post-cleaning swabs · 1 above the criterion · cleaning of the former is stepped up
Validation No process changes in the period · January's cooling validation stands
Conclusion Plan effective · next verification in December

At the audit


Mistakes auditors commonly flag

  • Verification that consists only of signing the records.
  • Monitoring probes and thermometers that are not calibrated.
  • Product testing unrelated to the hazards in the plan.
  • Critical limits that have never been validated.
  • Verification results that change nothing even when they show problems.

In Kimobox


How this record is kept in Kimobox

  1. 1Verification activities are scheduled with their frequency and owner, and the system warns you before each one falls due.
  2. 2Calibration of monitoring equipment is tracked with advance warning; overdue equipment stops showing as fit for use.
  3. 3Laboratory results are linked to the batch and feed the certificates of analysis.
  4. 4Internal audits of the plan use their checklist, and their findings become actions with deadlines.

Frequently asked questions


What people ask us before getting started

What is the difference between validating and verifying?

Validating means showing, before relying on a control, that it is capable of controlling the hazard. Verifying means checking afterwards, regularly, that it is applied properly and still works.

How often should verification take place?

The Regulation says "regularly" and leaves the frequency to the operator according to risk. The usual approach is to review records daily or weekly, carry out an overall verification periodically and a full review at least once a year.

Is laboratory testing mandatory?

It depends on the hazard analysis and, for some products, on the legal microbiological criteria. As verification it is one more tool, not a substitute for monitoring.

Keep your HACCP records without loose templates

We'll show you the module running with data similar to yours.

Request a demo

Sources


Where each figure comes from

References to the official text in force. If a standard is revised, this page is updated and the review date says so.

  1. Regulation (EC) No 852/2004 on the hygiene of foodstuffs (Article 5 and Annex II) EUR-Lex · 29 April 2004
  2. General Principles of Food Hygiene, CXC 1-1969 Codex Alimentarius (FAO/WHO) · 2020 revision